The project proposes approximately 3.2 miles of highway construction beginning 500 feet west of the junction of N Avenue and U.S. Highway 30 and proceeding easterly on existing U.S. Highway 30 to a termination point. The proposed improvement includes expanding U.S. Highway 30 into a four-lane divided highway; drainage structures; street lighting; traffic signalization as required; storm sewer drainage from the beginning of the project easterly to the city limits; and improvement of five railroad crossings. Environmental impacts are discussed.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Project F-227(7), Kearney-East, Buffalo County, Nebraska


    Publication date :

    1974


    Size :

    17 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English