The project proposes approximately 3.2 miles of highway construction beginning 500 feet west of the junction of N Avenue and U.S. Highway 30 and proceeding easterly on existing U.S. Highway 30 to a termination point. The proposed improvement includes expanding U.S. Highway 30 into a four-lane divided highway; drainage structures; street lighting; traffic signalization as required; storm sewer drainage from the beginning of the project easterly to the city limits; and improvement of five railroad crossings. Environmental impacts are discussed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Project F-227(7), Kearney-East, Buffalo County, Nebraska


    Erscheinungsdatum :

    1974


    Format / Umfang :

    17 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch