The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. The Program currently includes thirteen sites located in diverse geographic, metrologic, and metropolitan areas across the United States. Information is shared reciprocally with a fourteenth site, not under Program contract. The vehicles. are operator-owned, except for two Griffon vans. The Mission Statement of the Site Operator Program includes three major activities: (1) Advancement of electric vehicle technologies. (2) Development of infrastructure elements necessary to support significant electric vehicle use; and (3) Increasing the awareness and acceptance of electric vehicles (EVs) by the public. The ultimate thrust of program activities varies among sites, reflecting not only the Operator's business interests but also geographic and climate-related operating conditions. These considerations are identified below for each Program Status entry. This second quarter report (FY-94) will include a summary of activities from the previous three quarters.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Electric and Hybrid Vehicle Program Site Operator Program. Quarterly progress report, January--March 1994, (Second quarter of Fiscal Year 1994)


    Contributors:
    D. M. Kiser (author) / J. F. Warren (author)

    Publication date :

    1994


    Size :

    55 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English