The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. The Program currently includes thirteen sites located in diverse geographic, metrologic, and metropolitan areas across the United States. Information is shared reciprocally with a fourteenth site, not under Program contract. The vehicles. are operator-owned, except for two Griffon vans. The Mission Statement of the Site Operator Program includes three major activities: (1) Advancement of electric vehicle technologies. (2) Development of infrastructure elements necessary to support significant electric vehicle use; and (3) Increasing the awareness and acceptance of electric vehicles (EVs) by the public. The ultimate thrust of program activities varies among sites, reflecting not only the Operator's business interests but also geographic and climate-related operating conditions. These considerations are identified below for each Program Status entry. This second quarter report (FY-94) will include a summary of activities from the previous three quarters.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Electric and Hybrid Vehicle Program Site Operator Program. Quarterly progress report, January--March 1994, (Second quarter of Fiscal Year 1994)


    Beteiligte:
    D. M. Kiser (Autor:in) / J. F. Warren (Autor:in)

    Erscheinungsdatum :

    1994


    Format / Umfang :

    55 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch