The Federal Aid Route 17 project will replace a narrow gravel surfaced road to provide an all weather 2-lane paved road connecting U.S. Highway 31 and Federal Aid Secondary Route No. 12. There will be no displacement of people. The project will require approximately 50 acres of land for right of way necessary to make this improvement. There will be some increase in the noise within the area while the project is being constructed.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Project S-1117(102), Chilton County, Alabama


    Publication date :

    1971


    Size :

    7 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    CHILTON DW1

    British Library Online Contents | 2017


    Nr. 1117

    DataCite | 1866

    Free access

    Doppeltest:Mercedes 1117 und 1320

    Zeitzen,F. / Daimler-Benz,Stuttgart | Automotive engineering | 1986


    Mercedes-Benz 1117 Test

    Domina,T. / Daimler-Benz | Automotive engineering | 1986