The Federal Aid Route 17 project will replace a narrow gravel surfaced road to provide an all weather 2-lane paved road connecting U.S. Highway 31 and Federal Aid Secondary Route No. 12. There will be no displacement of people. The project will require approximately 50 acres of land for right of way necessary to make this improvement. There will be some increase in the noise within the area while the project is being constructed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Project S-1117(102), Chilton County, Alabama


    Erscheinungsdatum :

    1971


    Format / Umfang :

    7 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    CHILTON DW1

    British Library Online Contents | 2017


    Nr. 1117

    DataCite | 1866

    Freier Zugriff

    Doppeltest:Mercedes 1117 und 1320

    Zeitzen,F. / Daimler-Benz,Stuttgart | Kraftfahrwesen | 1986


    Mercedes-Benz 1117 Test

    Domina,T. / Daimler-Benz | Kraftfahrwesen | 1986