Appendixes for Volume 2 (Part 2) of a seven volume Satellite (SPS) report are presented. The document contains two appendixes. The first is a SPS work breakdown structure dictionary. The second gives SPS cost estimating relationships and contains the cost analyses and a description of cost elements that comprise the SPS program.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Satellite Power Systems (SPS) Concept Definition Study, Exhibit C. Volume 2, Part 2: System Engineering, Cost and Programmatics, Appendixes


    Contributors:

    Publication date :

    1979


    Size :

    322 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English