The overall program and resources needed for development and operation of a Satellite Services System is reviewed. Program requirements covered system operations through 1993 and were completed in preliminary form. Program requirements were refined based on equipment preliminary design and analysis. Schedules, costs, equipment utilization, and facility/advanced technology requirements were included in the update. Equipment user charges were developed for each piece of equipment and for representative satellite servicing missions.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Satellite services system analysis study. Volume 5: Programmatics


    Publication date :

    1981-08-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English