The proposed project will replace the existing rotary south of the Bourne Bridge with a Routes 25 and 28 interchange. A new northbound lane will be constructed for Route 28; the present northbound lane will become the southbound lane, and the present southbound lane will become a two-way service road. The Route 25 connector will begin at the proposed interchange and run in an easterly direction to Route 6 (Mid-Cape Highway) where a Routes 25 and 6 interchange will be constructed. The Route 25 connector and the proposed Route 28 will be divided highways with full access control. Environmental impacts are discussed.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    4.1 Mile Improvement of State Route 28, 4.4 Mile Extension of State Route 25, Bourne, Barnstable County


    Publication date :

    1974


    Size :

    93 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English