Contents: Significant unit activities: Personnel, administration, morale, discipline; Plans, operations and training; Logistics and maintenance. Medical: Treatment of venereal disease; Air station lab equipment; Unit sanitation; Ear and skin infections; Drug procurement. Standards of concrete placement and finishing; Construction planning and scheduling; Dummy joints in concrete slab; Fragmentation of TO/E organization; Concrete construction joints; Concrete placement; Concrete placement safety. Maintenance: Turbo-charger elbow on the Clark 290 M tractor; Damage to fuel tanks on the 290 M tractor; Cradle pin on 290 M tractor; Fuel inlet line on 290 M tractor; D7E dozer hydraulic lines; Loading and transporting rollers incorrectly; Damage to quarry equipment; Engineer maintenance float.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Lessons Learned, Headquarters, 87TH Engineer Battalion (Construction)


    Publication date :

    1967


    Size :

    42 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English