Contents: Significant unit activities: Personnel, administration, morale, discipline; Plans, operations and training; Logistics and maintenance. Medical: Treatment of venereal disease; Air station lab equipment; Unit sanitation; Ear and skin infections; Drug procurement. Standards of concrete placement and finishing; Construction planning and scheduling; Dummy joints in concrete slab; Fragmentation of TO/E organization; Concrete construction joints; Concrete placement; Concrete placement safety. Maintenance: Turbo-charger elbow on the Clark 290 M tractor; Damage to fuel tanks on the 290 M tractor; Cradle pin on 290 M tractor; Fuel inlet line on 290 M tractor; D7E dozer hydraulic lines; Loading and transporting rollers incorrectly; Damage to quarry equipment; Engineer maintenance float.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Lessons Learned, Headquarters, 87TH Engineer Battalion (Construction)


    Erscheinungsdatum :

    1967


    Format / Umfang :

    42 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch