Progress status during the period from contract initiation on 4/15/78 to 8/31/78 is reported for each task in the Program's Work Breakdown Statement scheduled to be activated. A discussion of the general considerations required for electric vehicle battery design is presented. The procedures which Eltra followed in generating its ISOA design are described. (ERA citation 05:007340)
Research, Development and Demonstration of Lead-Acid Batteries for Electric Vehicle Propulsion. Annual Report, 1978
1979
69 pages
Report
No indication
English