Progress status during the period from contract initiation on 4/15/78 to 8/31/78 is reported for each task in the Program's Work Breakdown Statement scheduled to be activated. A discussion of the general considerations required for electric vehicle battery design is presented. The procedures which Eltra followed in generating its ISOA design are described. (ERA citation 05:007340)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Research, Development and Demonstration of Lead-Acid Batteries for Electric Vehicle Propulsion. Annual Report, 1978


    Erscheinungsdatum :

    1979


    Format / Umfang :

    69 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch