The Silt Sampling Study was initiated by the Office of Chief of Engineers, U.S. Army, in an effort and in connection with other studies, to ascertain the cause of the erosion observed on the baffle piers and deck of Bonneville Spillway Dam at Bonneville, Oregon. The purpose of the study was to determine, over a period of one year (1 April 1942 to 31 March 1943), the amount and character of the suspended material carried by the Columbia River at Bonneville Spillway Dam.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Silt Sampling Study, Bonneville Spillway Dam, Bonneville, Oregon


    Publication date :

    1944


    Size :

    21 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English






    Pontiac Bonneville

    Automotive engineering | 1987


    Bonneville dam

    Gorlinski, J.S. | Engineering Index Backfile | 1935


    Triumph Bonneville

    Duckworth, Mick ;Mann, Jim | SLUB | 2011