The Silt Sampling Study was initiated by the Office of Chief of Engineers, U.S. Army, in an effort and in connection with other studies, to ascertain the cause of the erosion observed on the baffle piers and deck of Bonneville Spillway Dam at Bonneville, Oregon. The purpose of the study was to determine, over a period of one year (1 April 1942 to 31 March 1943), the amount and character of the suspended material carried by the Columbia River at Bonneville Spillway Dam.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Silt Sampling Study, Bonneville Spillway Dam, Bonneville, Oregon


    Erscheinungsdatum :

    1944


    Format / Umfang :

    21 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    Pontiac Bonneville

    Kraftfahrwesen | 1987


    Bonneville dam

    Gorlinski, J.S. | Engineering Index Backfile | 1935


    Triumph Bonneville

    Duckworth, Mick ;Mann, Jim | SLUB | 2011