The inland waterway system of the U.S. is a vital network for transporting key goods and commodities from the point of production to manufacturers and consumers. Shipping materials via the inland waterways is arguably the most economical and environmentally friendly option (compared to hauling freight by trains or railways). Despite the advantages the inland waterways enjoys over competing modes, key infrastructure such as locks and dams, which help to control water levels on a number of rivers and make navigation possible is declining. Limited funds have been allocated to make the necessary repairs to lock and dam facilities. Over the past 10 years Inland Waterways Trust Fund resources (which historically funded maintenance and improvement projects) has steadily declined. Locks and dams are of particular importance, because they assist in the maintenance of navigable depths on many of the major inland waterways (Ohio River, Upper Mississippi River, Tennessee River). To better understand the operation of the inland waterway system, this report examines a portion of the Ohio River (extending from Markland Locks and Dam to Lock 53). The specific focus is to determine what delays barge tows as they attempt to lock through these critical facilities. The Ohio River is a particularly important study area. In many ways it is representative of the conditions present throughout the inland waterways system. The average age of the lock and dam facilities exceed 50 years along our study segment. Most of these facilities are operating beyond their intended design life. As locks age, they increasingly demand more scheduled and unscheduled maintenance activities. Maintenance activities often require temporarily shuttering a lock chamber and diverting traffic through another onsite chamber (often of smaller capacity). All of the facilities included in the research area have two lock chambers - thus, if one goes down for maintenance all vessels are diverted through the second chamber. In many cases this situation can produce extensive delays, which precludes cargo from reaching the destination in a timely manner.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Inland Waterway Operational Model and Simulation Along the Ohio River


    Contributors:
    D. Kreis (author) / R. E. Sturgill (author) / B. K. Howell (author) / C. Van Dyke (author) / D. S. Voss (author)

    Publication date :

    2014


    Size :

    232 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Inland waterway transport

    Fraser, W. | Engineering Index Backfile | 1944


    Inland waterway tankers

    Online Contents | 1993



    Inland waterway VTS

    Online Contents | 1995


    Inland Waterway Briefs

    Online Contents | 1993