This part of the specification establishes performance/design requirements of one design requirements of one design of equipment identified as the Missile Handling Rail. This contract end item, when used with a lifting device (hoist), provides vertical lifting of a single AGM-65A Missile. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Contract End Item Detail Specification (Identification Item) Performance/Design and Product Configuration Requirements. Cei Nomenclature: Rail, Missile Handling for Weapon System 319A(Maverick)


    Publication date :

    1968


    Size :

    9 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English