This part of the specification establishes performance/design requirements of one design requirements of one design of equipment identified as the Missile Handling Rail. This contract end item, when used with a lifting device (hoist), provides vertical lifting of a single AGM-65A Missile. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Contract End Item Detail Specification (Identification Item) Performance/Design and Product Configuration Requirements. Cei Nomenclature: Rail, Missile Handling for Weapon System 319A(Maverick)


    Erscheinungsdatum :

    1968


    Format / Umfang :

    9 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch