B-1B aircraft 85-0085 arrived 29 Jul 96 for PDM. Aircraft experienced intermittent electrical failures during Functional Check Flight (FCF) on 27 Nov 96. Troubleshot defect and conducted Operational Check Flight (OCF) on 7 Dec 96. Intermittent failure reoccurred during flight. Extensive troubleshooting identified several defective electrical power components which feasibly could have caused the in-flight failure. These components were removed and replaced. Detailed troubleshooting background is included. An OCF is scheduled for 10 Jan 97, weather permitting, with FCF to follow 11 Jan 97. After successful FCF, delivery is scheduled for 22 Jan 97.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Technical Test Plan for Aircraft 85-0085 Intermittent Power Failure Anomaly Flight


    Contributors:

    Publication date :

    1997


    Size :

    63 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Piloted Simulator Evaluation of a Model-Independent Fault-Tolerant Flight Control System (AIAA 2016-0085)

    Tang, Dennis / Pool, Daan M. / Stroosma, Olaf et al. | British Library Conference Proceedings | 2016


    Plan for Flight Testing Intermittent Positive Control

    J. W. Andrews / A. L. McFarland / J. F. Golden et al. | NTIS | 1975



    AIRCRAFT FLIGHT PLAN SYSTEMS

    MOZER REESE ALEXANDER | European Patent Office | 2018

    Free access