South Sumatera Palembang Light Rail Transit or abbreviated LRT Palembang is a type of mass transit system that was built to connect between Sultan Mahmud ßadaruddin II International Airport with Jakabaring Sports Complex. LRT Palembang system will be supplied by traction substations installed along the route. Therefore, an analysis and design is done to determine the power capacity and number of traction substations that will be used. Principally, the way to determine amount and capacity of traction substration including the analysis and design amount of trainset, the speed and operational time of the system, the force acting on the trainset, the trainset power capacity, the substation's location, the voltage drop and the power capacity of the traction substation.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Study on capacity calculation of traction substations LRT (Light Rail Transit) Palembang Sumatera Selatan


    Contributors:


    Publication date :

    2017-10-01


    Size :

    1863544 byte




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English




    Traction substations

    Warder, S.B. | Engineering Index Backfile | 1950


    Modernization of the New York Transit Authority Traction Power Substations

    DeGenaro, T. / American Public Transit Association | British Library Conference Proceedings | 1995


    Traction vehicle for rail transit

    LU YANWEI / ZHANG JUNMIN / LI HAITAO et al. | European Patent Office | 2021

    Free access