South Sumatera Palembang Light Rail Transit or abbreviated LRT Palembang is a type of mass transit system that was built to connect between Sultan Mahmud ßadaruddin II International Airport with Jakabaring Sports Complex. LRT Palembang system will be supplied by traction substations installed along the route. Therefore, an analysis and design is done to determine the power capacity and number of traction substations that will be used. Principally, the way to determine amount and capacity of traction substration including the analysis and design amount of trainset, the speed and operational time of the system, the force acting on the trainset, the trainset power capacity, the substation's location, the voltage drop and the power capacity of the traction substation.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Study on capacity calculation of traction substations LRT (Light Rail Transit) Palembang Sumatera Selatan


    Beteiligte:


    Erscheinungsdatum :

    2017-10-01


    Format / Umfang :

    1863544 byte




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Traction substations

    Warder, S.B. | Engineering Index Backfile | 1950


    Modernization of the New York Transit Authority Traction Power Substations

    DeGenaro, T. / American Public Transit Association | British Library Conference Proceedings | 1995


    Traction vehicle for rail transit

    LU YANWEI / ZHANG JUNMIN / LI HAITAO et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Design of Grounding Systems for Tri-Met Portland Westside Light Rail Traction Power Substations

    Pham, K. D. / Thomas, R. S. / American Society of Mechanical Engineers; Rail Transportation Division| Institute of Electrical and Electronic Engineers; Land Transportation Division; Vehicular Technology Section | British Library Conference Proceedings | 1999