In this paper a novel approach will be shown to resolve the overload protection in satellite power subsystems. The proposed method provides an efficient solution with decreased number of components and dimensions. The principles of this system was originally developed by our group for the ESA Rosetta Lander and improved for the European Student Earth Orbiter (ESEO) project. The presented solution is implemented in the Electrical Power Subsystem (EPS) of the ESEO micro-satellite in the frame of ESA's Education Satellite Program.
Centralized overload handling for satellite power subsystem
2011-09-01
335659 byte
Conference paper
Electronic Resource
English
Electrical Power Subsystem of İMECE Satellite
IEEE | 2023
|Next generation GOES satellite power subsystem
IEEE | 2001
|MECB Data Collecting Satellite Power Supply Subsystem
NTIS | 1989
|