The M.S. Cubore, first cargo ship to be equipped with the new type Bethelehem oil engine and a full complement of automatic magnetic control deck machinery, was given her sea trials February 8, a day's trip outside of Baltimore. Because of the wide interest in the unique equipment of this ship, many persons prominent in naval architecture and shipbuilding, including representatives of the Emergency Fleet Corporation, made the trip.
A modern marine installation
Journal of the A.I.E.E. ; 43 , 3 ; 264
1924-03-01
311658 byte
Article (Journal)
Electronic Resource
English
MARINE PIPELINE INSTALLATION SYSTEM AND MARINE PIPELINE INSTALLATION METHOD
European Patent Office | 2018
|Marine pipeline installation system and marine pipeline installation method
European Patent Office | 2019
|Engineering Index Backfile | 1933
|