This charge management method includes an acquisition step (ST1), a prediction step (ST2), and a planning step (ST3). In the acquisition step (ST1), position information pertaining to a moving body that is driven using electricity as an energy source, cell information relating to the residual capacity of a storage cell mounted in the moving body, and history information relating to the charge history of the storage cell are acquired. In the prediction step (ST2), the charge demand for one or more charge facilities is predicted on the basis of the position information, cell information, and history information acquired in the acquisition step (ST1). In the planning step (ST3), a charge plan for charging the storage cell is determined, on the basis of the charge demand predicted in the prediction step (ST2), such that the charge demand is suppressed to or below a prescribed value.

    Ce procédé de gestion de charge comprend une étape d'acquisition (ST1), une étape de prédiction (ST2) et une étape de planification (ST3). Dans l'étape d'acquisition (ST1), des informations de position concernant un corps mobile qui est entraîné en utilisant de l'électricité en tant que source d'énergie, des informations de cellule concernant la capacité résiduelle d'une cellule de stockage montée dans le corps mobile, et des informations d'historique concernant l'historique de charge de la cellule de stockage sont acquises. Dans l'étape de prédiction (ST2), la demande de charge pour une ou plusieurs installations de charge est prédite sur la base des informations de position, des informations de cellule et des informations d'historique acquises dans l'étape d'acquisition (ST1). Dans l'étape de planification (ST3), un plan de charge pour charger la cellule de stockage est déterminé, sur la base de la demande de charge prédite dans l'étape de prédiction (ST2), de telle sorte que la demande de charge est supprimée à une valeur prescrite ou en dessous de celle-ci.

    充電管理方法は、取得ステップ(ST1)と、予測ステップ(ST2)と、計画ステップ(ST3)と、を含む。取得ステップ(ST1)では、電気をエネルギー源として駆動する移動体の位置情報、移動体に搭載されている蓄電池の残容量に関する電池情報、及び蓄電池の充電履歴に関する履歴情報を取得する。予測ステップ(ST2)では、取得ステップ(ST1)が取得した位置情報、電池情報、及び履歴情報に基づいて、1以上の充電設備の充電需要を予測する。計画ステップ(ST3)では、予測ステップ(ST2)が予測した充電需要に基づいて、充電需要を所定値以下に抑えるように蓄電池を充電する充電計画を決定する。


    Access

    Download


    Export, share and cite



    Title :

    CHARGE MANAGEMENT METHOD, PROGRAM, AND CHARGE MANAGEMENT SYSTEM


    Additional title:

    PROCÉDÉ DE GESTION DE CHARGE, PROGRAMME ET SYSTÈME DE GESTION DE CHARGE
    充電管理方法、プログラム、及び充電管理システム


    Contributors:

    Publication date :

    2022-10-06


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Japanese


    Classification :

    IPC:    G06Q Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke , DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES / B60L PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES , Antrieb von elektrisch angetriebenen Fahrzeugen / G01C Messen von Entfernungen, Höhen, Neigungen oder Richtungen , MEASURING DISTANCES, LEVELS OR BEARINGS / G08G Anlagen zur Steuerung, Regelung oder Überwachung des Verkehrs , TRAFFIC CONTROL SYSTEMS / G16Y / H01M Verfahren oder Mittel, z.B. Batterien, für die direkte Umwandlung von chemischer in elektrische Energie , PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY / H02J CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER , Schaltungsanordnungen oder Systeme für die Abgabe oder Verteilung elektrischer Leistung



    CHARGE MANAGEMENT SYSTEM, CHARGE SYSTEM, CHARGE MANAGEMENT METHOD, AND PROGRAM

    YAMAMOTO YUTO / OSHIMA AKIYOSHI | European Patent Office | 2024

    Free access

    CHARGE MANAGEMENT SYSTEM, CHARGE SYSTEM, CHARGE MANAGEMENT METHOD, AND PROGRAM

    YAMAMOTO YUTO / OSHIMA AKIYOSHI | European Patent Office | 2022

    Free access

    CHARGE MANAGER, CHARGE MANAGEMENT METHOD, AND CHARGE MANAGEMENT PROGRAM

    SHIRASU JUNICHI | European Patent Office | 2015

    Free access

    CHARGE MANAGEMENT SYSTEM, CHARGING SYSTEM, CHARGE MANAGEMENT METHOD, AND PROGRAM

    YAMAMOTO YUTO / OSHIMA AKIYOSHI | European Patent Office | 2022

    Free access