A full-day train operation diagram generating method based on the relationship between a time-sharing plan and activity events, comprising: S1, configuring basic parameters of an operation plan; S2, constructing, for different routing ratios, the quantitative relationship between travel time and departure intervals, and calculating the actual reversing time at each reversing station that can meet the requirements of each routing ratio within a given reversing time range; S3, generating arrival and departure event time points of a train at each station platform of different time periods for different routings, directions, and proportions, correcting start and end time points for each routing for different time periods to achieve transition between time periods; and S4, according to full-time period train arrival and departure event time points obtained by executing step S3 multiple times, connecting section operation and stop activities of trains, matching train set reversing and departing/garaging activities, and correcting track occupation conflict-related arrival and departure time points, so as to obtain a full-day train operation diagram. The beneficial effect is that advantages of standardized routing ratio and automatic high-/low-peak transition are achieved.

    La présente invention concerne un procédé de génération d'un graphique de marche de trains d'une journée complète fondé sur la relation entre un plan de partage de temps et des événements d'activité, qui consiste : S1 : à configurer des paramètres de base d'un plan de marche ; S2 : à établir, pour différents rapports d'itinéraire, la relation quantitative entre le temps de déplacement et les intervalles de départ, et à calculer le temps de rebroussement réel au niveau de chaque gare de rebroussement qui peut satisfaire les exigences de chaque rapport d'itinéraire dans une plage de temps de rebroussement donnée ; S3 : à générer des points temporels d'événements d'arrivée et de départ d'un train au niveau de chaque quai de gare lors de différentes périodes pour différents itinéraires, directions et proportions, à corriger des points de début et de fin pour chaque itinéraires pendant différentes périodes afin d'obtenir une transition entre des périodes ; S4 : en fonction de points temporels d'événements d'arrivée et de départ de trains pendant des périodes complètes obtenus en exécutant l'étape S3 de multiples fois, à connecter des activités de marche et d'arrêt de section, à mettre en correspondance des activités de rebroussement et de départ/de mise en remise de rames, et à corriger des points d'arrivée et de départ liés à des conflits d'occupation de la voie, de façon à obtenir un graphique de marche de trains d'une journée complète. L'invention présente les avantages d'offrir un rapport d'itinéraire standardisé et une transition automatique entre les périodes de haute/faible affluence.

    一种基于分时方案和活动事件关系的全日列车运行图生成方法,包括:S1.配置开行方案基本参数;S2.针对不同的交路配比情况,构建旅行时间和行车间隔之间的数量关系,在给出的折返时间范围内计算可实现交路配比要求的各个折返站实际折返时间;S3.分交路、分方向、分比例生成每个时段的列车在车站站台的到发事件时刻,修正每个交路分时段起止时刻,在时段之间衔接过渡;S4.根据多次执行步骤S3得到的全时段列车到发事件时刻,连接列车区间运行、停站活动,匹配车底折返和出入库活动,修正股道占用冲突相关的到发时刻,从而得到全日列车运行图。有益效果:具有标准化交路配比、自动化高低峰衔接过渡等优点。


    Access

    Download


    Export, share and cite



    Title :

    FULL-DAY TRAIN OPERATION DIAGRAM GENERATING METHOD BASED ON RELATIONSHIP BETWEEN TIME-SHARING PLAN AND ACTIVITY EVENTS


    Additional title:

    PROCÉDÉ DE GÉNÉRATION DE GRAPHIQUE DE MARCHE DE TRAINS D'UNE JOURNÉE COMPLÈTE FONDÉ SUR LA RELATION ENTRE UN PLAN DE PARTAGE DE TEMPS ET DES ÉVÉNEMENTS D'ACTIVITÉ
    基于分时方案和活动事件关系的全日列车运行图生成方法


    Contributors:
    LIU FENGBO (author) / QIAN JIANG (author) / YAN HONGHUI (author) / XU JING (author) / ZHOU TINGLIANG (author) / WANG LANXIANG (author)

    Publication date :

    2021-10-07


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC



    Full-day train operation diagram generating method based on relationship between time-sharing plan and activity events

    LIU FENGBO / QIAN JIANG / YAN HONGHUI et al. | European Patent Office | 2021

    Free access

    FULL-DAY TRAIN OPERATION DIAGRAM GENERATING METHOD BASED ON RELATIONSHIP BETWEEN TIME-SHARING PLAN AND ACTIVITY EVENTS

    LIU FENGBO / QIAN JIANG / YAN HONGHUI et al. | European Patent Office | 2022

    Free access

    FULL-DAY TRAIN OPERATION DIAGRAM GENERATION METHOD BASED ON TIME DIVISION SCHEME AND ACTIVITY-EVENT RELATIONSHIP

    LIU FENGBO / QIAN JIANG / YAN HONGHUI et al. | European Patent Office | 2022

    Free access

    OPERATION PLAN SERVER AND TRAIN DIAGRAM PREPARATION METHOD

    EIMAEDA NAOYA / YANO HIROHITO / YAMAZAKI JUN et al. | European Patent Office | 2015

    Free access

    Method and system for generating train operation plan based on shunting plan

    SU BIN / YAN XIANG / LIU YONGZHUANG | European Patent Office | 2024

    Free access