A full-day train operation diagram generating method based on the relationship between a time-sharing plan and activity events, comprising: S1, configuring basic parameters of an operation plan; S2, constructing, for different routing ratios, the quantitative relationship between travel time and departure intervals, and calculating the actual reversing time at each reversing station that can meet the requirements of each routing ratio within a given reversing time range; S3, generating arrival and departure event time points of a train at each station platform of different time periods for different routings, directions, and proportions, correcting start and end time points for each routing for different time periods to achieve transition between time periods; and S4, according to full-time period train arrival and departure event time points obtained by executing step S3 multiple times, connecting section operation and stop activities of trains, matching train set reversing and departing/garaging activities, and correcting track occupation conflict-related arrival and departure time points, so as to obtain a full-day train operation diagram. The beneficial effect is that advantages of standardized routing ratio and automatic high-/low-peak transition are achieved.
Full-day train operation diagram generating method based on relationship between time-sharing plan and activity events
2021-11-11
Patent
Electronic Resource
English
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
European Patent Office | 2021
|European Patent Office | 2022
|European Patent Office | 2022
|OPERATION PLAN SERVER AND TRAIN DIAGRAM PREPARATION METHOD
European Patent Office | 2015
|Method and system for generating train operation plan based on shunting plan
European Patent Office | 2024
|