A group supervisory control device for an elevator includes a hall call assignment portion assigning a specific car to a hall call registered; an operation prediction portion predicting which is the operation to the next hall registered, regenerative operation or power running operation, and the time for which the regenerating operation or the power running operation is performed when the specific car has stopped at a responding hall; and a door open time control portion comparing the time for which the regenerative operation or the power running operation of the specific car is performed with the remaining running time of any other car performing the power running operation or the regenerative operation already predicted, calculating overlap time for the operations simultaneously, and making door open time set for the specific car changed to determine the door open time that can obtain longer overlap time, whereby a door is closed.


    Access

    Download


    Export, share and cite



    Title :

    Group supervisory control device for elevator


    Contributors:

    Publication date :

    2016-04-19


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    B66B Aufzüge , ELEVATORS




    Elevator group supervisory operation system and elevator group supervisory operation method

    HATORI TAKAHIRO / MAEHARA TOMOAKI / NISHIDA TAKEO et al. | European Patent Office | 2015

    Free access

    Elevator group supervisory control systems using genetic network programming

    Eguchi, T. / Hirasawa, K. / Hu, Jinglu et al. | Tema Archive | 2004


    Control device of destination floor reservation group supervisory operation elevator

    YAMANOSHITA KOICHI / HOSHINO KODO / TORITANI BEKUNI et al. | European Patent Office | 2015

    Free access

    Modern elevator group supervisory control systems and neural networks technique

    Zhu, Dewen / Jiang Li / Zhou, Yuwen et al. | Tema Archive | 1997