The congestion degree calculation means 81 calculates a congestion degree at a vehicle and a stop. The diagram output means 82 outputs a modified diagram in which a current diagram is modified by optimizing an objective function learned using business history data including an actual change of a diagram. The risk calculation means 83 calculates a current risk which is a risk occurring at the present time, and a modification risk which is a risk caused by modifying the diagram, based on the congestion degree. The risk output means 84 outputs the calculated current risk and the modification risk.


    Access

    Download


    Export, share and cite



    Title :

    MODIFICATION RISK OUTPUT DEVICE, MODIFICATION RISK OUTPUT METHOD, AND MODIFICATION RISK OUTPUT PROGRAM


    Contributors:
    KUBOTA DAI (author) / ETO RIKI (author)

    Publication date :

    2023-06-01


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC



    CORRECTION RISK OUTPUT DEVICE, CORRECTION RISK OUTPUT METHOD, AND CORRECTION RISK OUTPUT PROGRAM

    KUBOTA DAI / ETO RIKI | European Patent Office | 2021

    Free access

    TRAFFIC RISK INFORMATION OUTPUT SYSTEM AND TRAFFIC RISK INFORMATION OUTPUT PROGRAM

    KASAHARA HAJIME | European Patent Office | 2020

    Free access

    RISK INFORMATION OUTPUT DEVICE

    SHIBATA KOJI / INOUE TOSHIAKI | European Patent Office | 2021

    Free access

    RISK INFORMATION OUTPUT DEVICE

    SHIBATA KOJI / INOUE TOSHIAKI | European Patent Office | 2024

    Free access