The congestion degree calculation means 81 calculates a congestion degree at a vehicle and a stop. The diagram output means 82 outputs a modified diagram in which a current diagram is modified by optimizing an objective function learned using business history data including an actual change of a diagram. The risk calculation means 83 calculates a current risk which is a risk occurring at the present time, and a modification risk which is a risk caused by modifying the diagram, based on the congestion degree. The risk output means 84 outputs the calculated current risk and the modification risk.
MODIFICATION RISK OUTPUT DEVICE, MODIFICATION RISK OUTPUT METHOD, AND MODIFICATION RISK OUTPUT PROGRAM
01.06.2023
Patent
Elektronische Ressource
Englisch
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
CORRECTION RISK OUTPUT DEVICE, CORRECTION RISK OUTPUT METHOD, AND CORRECTION RISK OUTPUT PROGRAM
Europäisches Patentamt | 2021
|TRAFFIC RISK INFORMATION OUTPUT SYSTEM AND TRAFFIC RISK INFORMATION OUTPUT PROGRAM
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|