An operation control system for a tower crane is a tower crane operation control system applied to a tower crane. The tower crane operation control system has an operation control device. The operation control device comprises: a starting recognition unit recognizing whether a control unit starts; a load cell measurement value input unit in which the weight of lifted cargo is inputted; a potentiometer measurement value input unit in which the position of a trolley is inputted; an operation treatment unit storing a tower crane operation starting time that is the time recognized as starting by the starting recognition unit and a tower crane operation end time that is the time recognized as the end of the starting by the starting recognition unit; and a communication unit providing information having the tower crane operation starting time and the tower crane operation end time to the outside.
타워 크레인 운용 제어 시스템은, 타워 크레인에 적용되는 타워 크레인 운용 제어 시스템으로서, 타워 크레인 운용 제어 시스템은 운용 제어 장치를 포함하고, 운용 제어 장치는, 조종기 시동 여부를 인식하는 시동 인식부, 인양되는 화물의 무게가 입력되는 로드셀 측정값 입력부, 트롤리의 위치가 입력되는 포텐셔미터 측정값 입력부, 시동 인식부가 시동을 인식한 시점인 타워 크레인 운용 시작 시간 및 시동 인식부가 시동 종료를 인식하는 시점인 타워 크레인 운용 종료 시간을 저장하는 운용 처리부, 및 타워 크레인 운용 시작 시간 및 타워 크레인 운용 종료 시간을 포함하는 정보를 외부로 제공하는 통신부를 포함하는 것이다.
OPERATION CONTROL SYSTEM FOR TOWER CRANE
타워 크레인 운용 제어 시스템
2018-11-02
Patent
Electronic Resource
Korean
IPC: | B66C Krane , CRANES |
Tower crane jacking control system and method, tower crane jacking system and tower crane
European Patent Office | 2023
|TOWER CRANE JACKING CONTROL SYSTEM AND METHOD, TOWER CRANE JACKING SYSTEM AND TOWER CRANE
European Patent Office | 2024
|European Patent Office | 2025
|