To make it possible to smooth the flow of people inside a building having a plurality of floors.SOLUTION: A people flow management system for managing the flow of people inside a building having a plurality of floors, includes a number-of-moving-people calculation unit for calculating measured values of the number of forward passage users and the number of return passage users, in which a user of an elevator moving to a prescribed floor from each floor of the building is a forward passage user and a user of the elevator moving to each floor of the building from the prescribed floor is a return passage user, and a utilization time shift output unit for outputting an estimated value of the number of return passage users when the utilization time of the elevator with respect to a part of the forward passage users is shifted forward and backward. The utilization time shift output unit outputs an estimated value of the number of forward passage users by shifting the utilization time of the corresponding forward passage users depending on the shifting of the utilization time of the forward passage users.SELECTED DRAWING: Figure 1
【課題】複数の階床を有する建造物の内部における人の流れを円滑化することが可能となる。【解決手段】複数の階床を有する建造物の内部における人の流れを管理する人流管理システムであって、前記建造物の各階から所定階へ移動するエレベーターの利用者を往路利用者、前記所定階から前記建造物の各階へ移動するエレベーターの利用者を復路利用者とし、往路利用者数および復路利用者数の実測値を算出する移動人数算出部と、前記往路利用者の一部についてエレベーターの利用時間を前後に移動させた場合の往路使用者数の推測値を出力する利用時間シフト出力部と、を備え、前記利用時間シフト出力部は、前記往路利用者の利用時間の移動に応じて、対応する前記復路利用者の利用時間を移動させて前記復路利用者数の推測値を出力する。【選択図】図1
PEOPLE FLOW MANAGEMENT SYSTEM AND PEOPLE FLOW MANAGEMENT METHOD
人流管理システム及び人流管理方法
2022-10-14
Patent
Electronic Resource
Japanese
IPC: | B66B Aufzüge , ELEVATORS |
People flow management system and people flow management method
European Patent Office | 2023
|PEOPLE FLOW CONTROL SYSTEM AND PEOPLE FLOW CONTROL METHOD
European Patent Office | 2017
|People Flow Prediction Method and People Flow Prediction System
European Patent Office | 2021
|