The invention concerns a pile handling facility (100) for tilting a pile (10) from a laying orientation at least partly within a deck of a vessel (200) to an upright orientation outside an outer boundary of the deck and a method thereof. The pile handling facility (100) of comprises a pile (10), a vessel (200) comprising a deck (12) suitable for the pile, a lifting crane (400) fixed to the vessel, an upending tool (1) for supporting the pile during tilting from the laying orientation to the upright orientation and a winch system.


    Access

    Download


    Export, share and cite



    Title :

    PILE HANDLING FACILITY


    Additional title:

    PFAHLHANDHABUNGSANLAGE
    INSTALLATION DE MANIPULATION DE PIEUX


    Contributors:
    HØVIK JON (author)

    Publication date :

    2023-04-12


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS / E02D FOUNDATIONS , Gründungen / F03D Windkraftmaschinen , WIND MOTORS



    PILE HANDLING FACILITY

    HØVIK JON | European Patent Office | 2021

    Free access

    Pile carrying facility

    HOVIK JON | European Patent Office | 2023

    Free access

    PILE INSTALLATION FACILITY AND METHODS THEREOF

    TØRDAL SONDRE-SANDEN / HØVIK JON | European Patent Office | 2021

    Free access

    PILE INSTALLATION FACILITY AND METHODS THEREOF

    TØRDAL SONDRE-SANDEN / HØVIK JON | European Patent Office | 2023

    Free access

    Pile installation facility and method thereof

    TORRADO SANDOR-SANDON / HOVIK JON | European Patent Office | 2023

    Free access