The invention relates to a mounting facility and a method for mounting a pile (10) into the seabed in a vertical orientation at a target pile location. The installation facility comprises: a vessel (200) comprising a deck for storing a plurality of piles (10); a hoist crane (400) fixed to the vessel; the global positioning system is used for receiving global positioning coordinates; a ship motion sensor (8); and a mounting tool (2) fixed to the outer boundary of the deck for mounting the pile on the seabed. The installation tool (2) further comprises a pile motion sensor (9) for measuring the motion of the pile relative to the global positioning coordinates at the target pile location, and a pile gripper allowing to suppress pile motion.
本发明涉及一种用于将桩(10)以竖直定向在目标桩位置上安装到海床中的安装设施及其方法。安装设施包括:船舶(200),其包括用于储存多个桩(10)的甲板;提升起重机(400),其固定到船舶;全球定位系统,其用于接收全球定位坐标;船舶运动传感器(8);以及安装工具(2),其固定到甲板的外边界,用于将桩安装到海床上。安装工具(2)还包括桩运动传感器(9)和桩夹持器,桩运动传感器用于测量桩相对于目标桩位置处的全球定位坐标的运动,桩夹持器允许抑制桩运动。
Pile installation facility and method thereof
桩安装设施及其方法
2023-02-03
Patent
Electronic Resource
Chinese