In one embodiment, a method includes generating a first visual representation of a location of a railroad station in relation to a railroad track, receiving a request for a first maintenance window, and determining that the first maintenance window is associated with the railroad station. The method further includes determining a first time period and generating a second visual representation of information associated with the railroad station during the first time period. The information includes an indication of a time that a train is scheduled to cross the railroad station during the time period. The information also includes an indication of a time duration for a second maintenance window that has been requested during the time period.
SYSTEMS AND METHODS FOR SCHEDULING TRACK MAINTENANCE
SYSTEME UND VERFAHREN ZUR PLANUNG VON SPURWARTUNG
SYSTÈMES ET PROCÉDÉS DE PLANIFICATION DE LA MAINTENANCE DE VOIES
2023-02-08
Patent
Electronic Resource
English
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC / G06Q Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke , DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES |