In one embodiment, a method includes generating a first visual representation of a location of a railroad station in relation to a railroad track, receiving a request for a first maintenance window, and determining that the first maintenance window is associated with the railroad station. The method further includes determining a first time period and generating a second visual representation of information associated with the railroad station during the first time period. The information includes an indication of a time that a train is scheduled to cross the railroad station during the time period. The information also includes an indication of a time duration for a second maintenance window that has been requested during the time period.
Systems and methods for scheduling track maintenance
2022-08-18
Patent
Electronic Resource
English
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC / G06Q Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke , DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES |
Scheduling rail track maintenance
Tema Archive | 1998
|Scheduling Rail Track Maintenance
British Library Conference Proceedings | 1998
|