A device (10) is provided for performing a train integrity check on a train comprising a number of wagons, each wagon provided with air brakes operable by a pressure difference between a brake pipe (18) and a main reservoir pipe (22). The device comprises a spring-biased one-way valve, comprising an air path (12) having a first end (16) arranged to connect with the brake pipe (18) and a second end (20) arranged to connect with the main reservoir pipe (22).
TRAIN INTEGRITY PROVING DEVICE AND METHOD
VORRICHTUNG UND VERFAHREN ZUR PRÜFUNG DER ZUGINTEGRITÄT
DISPOSITIF ET PROCÉDÉ PERMETTANT DE PROUVER L'INTÉGRITÉ D'UN TRAIN
2023-10-11
Patent
Electronic Resource
English
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |