The plant (1) has local bracings provided as load-bearing assembly devices. Heavy load-module transporters (4) are provided on running tracks (3) for transporting between individual production stations e.g. first production station for foundation production, second production station for production of a mast i.e. pre-stressed concrete mast, third production station for final assembly and fourth production station (IV) i.e. transfer station, and between intermediate storage facilities if necessary. An independent claim is also included for a method for producing a partly-produced offshore wind energy plant in an onshore production plant.
ONSHORE-PRODUKTIONSANLAGE FÜR OFFSHORE-WINDENERGIEANLAGEN UND VERFAHREN ZUM ERSTELLEN VON MINDESTENS TEILGEFERTIGTEN OFFSHORE-WINDENERGIEANLAGEN
ONSHORE PRODUCTION FACILITY FOR OFFSHORE WIND ENERGY SYSTEMS AND METHOD FOR CREATING AT LEAST PARTIALLY FINISHED OFFSHORE WIND ENERGY SYSTEMS
INSTALLATION DE PRODUCTION SUR TERRE FERME D'INSTALLATIONS ÉOLIENNES EN MER ET PROCÉDÉ POUR CONSTRUIRE DES INSTALLATIONS ÉOLIENNES EN MER AU MOINS PRÉFABRIQUÉES
2016-11-09
Patent
Electronic Resource
German
Offshore-Windenergie - Verfahren zur Gründung von Offshore-Windenergieanlagen
Online Contents | 2013
Kollisionssicherheit von Offshore-Windenergieanlagen
Tema Archive | 2009
|Korrosionsschutz von Offshore-Windenergieanlagen
Tema Archive | 2001
|Oberflächenschutz von Offshore-Windenergieanlagen
Tema Archive | 2007
|Schwimmendes Offshore-Fundament für Windenergieanlagen
Tema Archive | 2014
|