The invention discloses a transformer area virtual power plant construction method and system based on flexible load regulation and control. According to energy supply and charging requirements, flexible and dynamic regulation and control and management are carried out on new energy automobile charging, distributed photovoltaic power generation and daily power utilization, and a distribution network area virtual power plant is established; determining a virtual power plant of the distribution network area and determining a flexible and dynamic control strategy of a charging load of the distribution network area; metering the intelligent carbon of the transformer area based on the block chain technology; a virtual power plant with a transformer area as a unit is constructed, and flexible and dynamic control strategies and electric intelligent carbon synchronous metering are carried out on charging loads. According to the invention, charging load access capability and dynamic adjustment capability are improved, cable and transformer loss is reduced, carbon emission is reduced, and carbon emission metering and data traceability are realized.
本发明公开了一种基于柔性负荷调控的台区虚拟电厂构建方法及系统,基于新能源汽车能量型负荷的可调控性,根据能源供给和充电需求对新能源汽车充电、分布式光伏发电及日常用电的进行柔性、动态调控和管理建立配网台区虚拟电厂;确定配网台区虚拟电厂确定配电台区充电负荷的柔性和动态控制策略;基于区块链技术对台区智能碳进行计量;构建以台区为单元的虚拟电厂,对充电负荷进行柔性和动态控制策略和电智能碳同步计量。本发明提高充电负荷接入能力、动态调节能力,降低电缆和变压器损耗、减少碳排放,并实现碳排放的计量和数据溯源。
Transformer area virtual power plant construction method and system based on flexible load regulation and control
一种基于柔性负荷调控的台区虚拟电厂构建方法及系统
2024-09-27
Patent
Electronic Resource
Chinese
Regional load aggregator-oriented transformer area user flexible load scheduling method
European Patent Office | 2025
|European Patent Office | 2024
|European Patent Office | 2025
|European Patent Office | 2024
|