The invention relates to the technical field of ship loading, in particular to a whole-section ship loading method for a three-main-truss steel truss girder, which comprises the following steps of: berthing a ship, anchoring and positioning after berthing, arranging a steel buttress for supporting the whole-section three-main-truss steel truss girder on a ship deck, hoisting the whole-section three-main-truss steel truss girder and transferring the whole-section three-main-truss steel truss girder to the upper part of the steel buttress; the whole-section three-main-truss steel truss girder is installed on the steel buttresses and fixed through the pulling anchors, it is guaranteed that the selected supporting columns can stably play a supporting role, meanwhile, the supporting columns do not need to be oversized or excessively used, and the shipment operation efficiency is improved.
本发明涉及装船技术领域,特别是涉及一种三主桁钢桁梁整节段装船方法,船舶靠港,靠港后下锚定位,在船舶甲板上布置用于支撑整节段三主桁钢桁梁的钢支墩,吊起整节段三主桁钢桁梁并转移至钢支墩上方,将整节段三主桁钢桁梁安装在钢支墩上,使用拉锚固定整节段三主桁钢桁梁,保障选用得支柱可以稳定起到支撑作用的同时,无需超规格和过量使用支柱,提高装船作业的效率。
Three-main-truss steel truss girder whole-section shipping method
一种三主桁钢桁梁整节段装船方法
2024-06-21
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
European Patent Office | 2023
|Steel truss girder pushing device and construction method thereof
European Patent Office | 2025
|