The invention discloses a net rack steel ball hoisting method, which comprises a net rack steel ball hoisting lock, and the net rack steel ball hoisting lock comprises an upper locking waistband, a lower locking waistband and at least three hoisting belts; the corresponding top ends of the three hanging belts are fixed at the center of the top sink, and the three hanging belts are uniformly distributed in the circumferential direction of the center of the top sink; the corresponding bottom ends of the three hanging belts are connected in series and locked by the lower locking waistband; the upper locking waistband is close to the center of the top sink to connect and lock the three hanging belts in series; the method further comprises the following operation steps that S1, a net rack steel ball is placed in a space defined by the three hanging belts; s2, a lower locking belt is locked below the center of the net rack steel ball; s3, the upper locking waistband is locked above the center of the net rack steel ball; s4, hoisting equipment is used for hoisting the net rack steel ball hoisting lock at the center position of the top sink, and the net rack steel balls are transported to the preset position; the labor cost can be saved, and the transfer efficiency is improved while the outer surface quality of the net rack steel balls is guaranteed.
本发明公开了一种网架钢球吊装方法,包括网架钢球吊装锁具,所述网架钢球吊装锁具包括上锁紧腰带、下锁紧腰带和至少三条吊带;三条所述吊带各自对应的顶端在顶汇中心固定,三条所述吊带均布在顶汇中心的周向;所述下锁紧腰带将三条所述吊带各自对应的底端串联锁紧;所述上锁紧腰带靠近顶汇中心将三条吊带串联锁紧;还包括以下操作步骤:S1.将网架钢球放置在三条吊带所围成的空间内;S2.使下锁紧腰带锁紧在网架钢球球心下方;S3.使上锁紧腰带锁紧在网架钢球球心上方;S4.利用吊装设备在顶汇中心位置起吊网架钢球吊装锁具,将网架钢球运输至预设位置;能够节约用工成本,保证网架钢球外表面质量的同时提升转运效率。
Net frame steel ball hoisting method
网架钢球吊装方法
2024-03-15
Patent
Electronic Resource
Chinese
IPC: | B66C Krane , CRANES |
Steel structure hoisting clamp, hoisting device and arch frame trolley
European Patent Office | 2022
|Caisson reinforcing steel bar hoisting and mounting process and hoisting frame
European Patent Office | 2021
|