The invention discloses a caisson reinforcing steel bar hoisting and mounting process and a hoisting frame. The caisson reinforcing steel bar hoisting and mounting process comprises the following steps that caisson reinforcing steel bars are integrally bound to form a pre-bound integral reinforcing steel bar structure; and the pre-bound integral steel bar structure is hoisted to a mounting station through a hoisting frame, and the pre-bound integral steel bar structure is mounted, so that the high-altitude operation of constructors and the investment of tower crane equipment are reduced, and the purpose of accelerating the prefabrication construction progress of the caisson is achieved.
本发明公开了一种沉箱钢筋吊运安装工艺及吊装架,沉箱钢筋吊运安装工艺包括以下步骤:将沉箱钢筋进行整体绑扎形成预绑整体钢筋结构;将所述预绑整体钢筋结构通过吊装架吊运至安装工位,并对所述预绑整体钢筋结构进行安装,实现减少施工人员高空作业和减少塔吊设备的投入,进而达到加快沉箱预制施工进度的目的。
Caisson reinforcing steel bar hoisting and mounting process and hoisting frame
沉箱钢筋吊运安装工艺及吊装架
2021-09-28
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|Reinforcing steel bar hoisting device and hoisting method thereof
European Patent Office | 2023
|Hoisting rod piece for caisson and manufacturing method of hoisting rod piece
European Patent Office | 2022
|