The invention discloses a high-stability-based box transformer substation suspended core overhauling tool which comprises an overhauling assembly, a fixing assembly and a mounting assembly, the overhauling assembly comprises a main frame, a pulling and hanging piece and a base fixedly connected with the main frame, and the pulling and hanging piece is fixedly connected with the main frame; the fixing assembly comprises an assembling part, a matching part and a striking part, the assembling part and the matching part are arranged in the base, the striking part is fixedly connected with the matching part, the matching part is arranged in the base, and the mounting assembly comprises a connecting rod matched with the assembling part. The maintenance work of the suspended core of the box transformer substation is realized through modular tool assembly, the labor efficiency can be greatly improved, the power generation loss caused by the expansion of the power failure range is reduced, the problem that the connection part is loosened and falls due to shaking in the maintenance work process can be avoided through the fixing assembly, and the maintenance efficiency is improved. And by arranging the mounting assembly, the bases at the two ends can be connected, so that the whole device is more stable.
本发明公开了一种基于高稳定性的箱变吊芯检修工装,包括检修组件、固定组件以及安装组件,检修组件包括主框架、拉吊件以及与主框架固定连接的底座,拉吊件与主框架固定连接,固定组件包括设置于底座内部的组装件、配合件以及与配合件固定连接的击打件,配合件设置于底座内部,安装组件包括与组装件配合的联接杆,通过检修组件的设置能实现在变压器顶棚不受影响的情况下,通过模块化的工装组装来实现箱变吊芯检修工作,可以极大地提升劳动效率,并减少停电范围扩大造成的发电量损失,通过固定组件能够实现在检修工作过程避免由于出现晃动而导致连接处松落的问题,而通过安装组件的设置也是能够实现两端底座的连接,使得整体装置更加稳定。
Box transformer substation hanging core maintenance tool based on high stability
一种基于高稳定性的箱变吊芯检修工装
2023-10-13
Patent
Electronic Resource
Chinese
Transformer on-load switch hanging core maintenance device
European Patent Office | 2024
|Indoor portable wire hanging device for transformer substation
European Patent Office | 2022
|Special tool for overhauling hanging core of distribution transformer
European Patent Office | 2020
|