The invention provides a linkage function configuration method and implementation method for a rail transit emergency scene. The configuration method comprises the following steps: according to project requirements, defining a trigger event, a linkage mode, a trigger area and a linkage action corresponding to an emergency scene in a configuration file; and the system software loads the configuration file to run, so that a corresponding emergency scene linkage function is realized. The implementation method comprises the following steps: receiving a target trigger event fed back by an external system, and determining whether to perform linkage in a configuration file according to a linkage mode corresponding to the target trigger event; after linkage is determined, searching a target trigger area corresponding to the occurrence position of the target trigger event in the trigger area; and searching a target linkage action corresponding to the target triggering area in the configuration file, and performing linkage according to the target linkage action. According to the invention, on the premise of adopting general software, the corresponding emergency scene linkage function is realized by reading various predefined information in the configuration file.
本发明提供一种轨道交通应急场景的联动功能配置方法及实现方法。其中配置方法包括:根据项目需求,在配置文件中定义应急场景所对应的触发事件、联动方式、触发区域、联动动作;系统软件加载所述配置文件运行,实现相应的应急场景联动功能。实现方法包括:接收外部系统反馈的一目标触发事件,在所述配置文件中按所述目标触发事件对应的联动方式确定是否进行联动;确定联动后,在所述触发区域中搜索所述目标触发事件的发生位置对应的目标触发区域;查找所述配置文件中所述目标触发区域所对应的目标联动动作,根据所述目标联动动作进行联动。本发明在采用通用软件的前提下,通过读取配置文件中的预定义的各种信息,实现相应的应急场景联动功能。
Linkage function configuration and implementation method for rail transit emergency scene
一种轨道交通应急场景的联动功能配置及实现方法
2023-09-26
Patent
Electronic Resource
Chinese