The invention discloses a hydropower station tailrace trolley equipment installing and transferring method which comprises the following steps that S01, tailrace trolley equipment parts are conveyed to a machine room road platform of a hydropower station, and hoisting equipment is moved to transfer the equipment parts to a spillway right side platform; s02, an electric moving platform on the spillway right side platform conveys the equipment parts transferred to the spillway right side platform from a moving hoisting vehicle operation area to an operation area of rotary hoisting equipment; s03, the rotary hoisting equipment transfers the equipment parts transferred to the spillway right side platform to a tail water platform assembling area; s04, the steps from S01 to S03 are repeated, and all the equipment parts are transferred to a tail platform assembling area; and S05, the tail water trolley equipment components are assembled into a whole in the tail water platform assembling area. According to the mounting and transferring method, a grouping type transferring and hoisting mode is adopted, it is ensured that the tail water trolley equipment parts can be stably transferred to the tail water platform, and the hoisting and transferring efficiency of the tail water trolley equipment parts is improved.
本发明公开了一种水电站尾水台车设备安装转运方法,包括以下步骤:S01:将尾水台车设备部件运送至水电站的机房公路平台上,移动吊装设备将设备部件转运至溢洪道右侧平台;S02:溢洪道右侧平台上的电动移动平台将转运至溢洪道右侧平台的设备部件从移动吊装车辆作业区运送至旋转吊装设备的作业区;S03:旋转吊装设备将转运至溢洪道右侧平台的设备部件转运至尾水平台拼装区;S04:重复S01至S03将所有设备部件转运至尾水平台拼装区;S05:在尾水平台拼装区将尾水台车设备部件组装成整体。在本发明中,该安装转运方法采用分组式的转运和吊装方式,确保尾水台车设备部件能够平稳的转运到尾水平台上,提高了尾水台车设备部件吊装转运的效率。
Method for installing and transferring hydropower station tail water trolley equipment
一种水电站尾水台车设备安装转运方法
2023-09-05
Patent
Electronic Resource
Chinese
IPC: | B66C Krane , CRANES |
Transferring trolley stop station and transferring trolley pull-in workpiece positioning method
European Patent Office | 2020
|Mobile operation trolley for hydropower station maintenance site
European Patent Office | 2025
|