The invention discloses a method for increasing the building batch of an LNG ship dock. The method specifically comprises the following steps that firstly, a to-be-built LNG ship is subjected to tight type dock arrangement in a dock; step 2, after the compact dock is arranged, optimizing an LNG dock construction scheme according to a dock assembly site and a lifting load, and constructing an LNG ship in the LNG dock; and thirdly, after the LNG ship is built in the dock, the LNG ship is pulled to be undocked, and building and undocking of the LNHG ship are completed. According to the method, various limiting conditions of the dock are eliminated and the construction period of the LNG dock is shortened by arranging the compact dock and optimizing the construction scheme of the LNG dock, so that the construction batch of the LNG dock is increased.
本发明公开了一种用于提高LNG船船坞建造批次的方法,该方法具体包括以下步骤:第一步,将待建造的LNG船在船坞内进行紧奏型船坞布置;第二步,紧奏型船坞布置完成后,根据船坞总组场地和起重负荷,对LNG船坞建造方案进行优化,并在LNG船坞内对LNG船进行建造;第三步,LNG船在船坞内建造完成后通过牵引使LNG船出坞,完成LNHG船舶的建造出坞。本发明通过紧奏型船坞布置并优化LNG船坞建造方案,消除船坞各项限制条件,缩短LNG船坞建造周期,从而提高LNG船坞建造批次。
Method for increasing construction batch of LNG ship dock
一种用于提高LNG船船坞建造批次的方法
2023-08-29
Patent
Electronic Resource
Chinese
NTIS | 2008
|Active guiding type unmanned ship dock and dock returning method
European Patent Office | 2021
|