The invention discloses an ultrahigh space electromechanical pipeline construction method. The method comprises the following steps that S1, partition modular design is carried out, comprehensive pipeline deepening is carried out on pipelines, collision analysis is carried out, and a combined support is arranged for stress analysis; s2, carrying out partition modular segmentation; s3, designing an integral lifting system; s4, carrying out partition modular prefabrication; s5, temporary consolidation is conducted, specifically, the subarea module sets are transversely and temporarily consolidated through 8 # channel steel and supporting and hoisting vertical profile steel in the modules, and a hoisting platform is formed; round steel with the diameter of 12 mm is adopted to be arranged on the vertical profile steel of the supporting and hanging bracket in an opposite-pulling mode. S6, overall lifting; and S7, module butt joint. According to the ultrahigh space electromechanical pipeline construction method, the construction method of partition module design and overall module lifting and assembling is adopted, a solution is provided for ultrahigh space electromechanical pipeline installation, the construction quality and progress of the electromechanical pipeline are guaranteed, meanwhile, high-place operation is greatly reduced, and potential safety hazards are avoided.

    本发明公开了一种超高空间机电管线施工方法,包括以下步骤:S1、分区模块化设计,管线进行综合管线的深化,进行碰撞分析,设置联合支架进行受力分析;S2、分区模块化分割;S3、整体提升体系的设计;S4、分区模块化预制;S5、临时固结,分区模块组采用8#槽钢和模块内支吊竖向型钢进行横向的临时固结,形成一个吊装平台;采用直径为12mm的圆钢在支吊架竖向型钢上对拉设置;S6、整体提升;S7、模块对接。本发明采用上述的一种超高空间机电管线施工方法,采用分区模块设计、模块整体提升组装的施工方法,为超高空间机电管线安装提供了解决方案,保证了机电管线的施工质量与进度,同时极大地减少了高处作业,避免安全隐患。


    Access

    Download


    Export, share and cite



    Title :

    Ultrahigh space electromechanical pipeline construction method


    Additional title:

    一种超高空间机电管线施工方法


    Contributors:
    WANG QIANG (author) / ZHU JIANGTAO (author) / HUA YUCHAO (author) / LI CHAOYANG (author) / YAO HONGBO (author) / WANG JIAFAN (author) / BAI JIAMING (author) / AN YONGBIN (author) / CUI MENG (author)

    Publication date :

    2023-05-09


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B66C Krane , CRANES / B66D Haspeln , CAPSTANS / H02G INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES , Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen



    Electromechanical pipeline construction device

    CHEN PENG / LU KAI / ZHOU XIAOCHAO et al. | European Patent Office | 2024

    Free access

    Electromechanical integrated pipeline installation construction method

    MENG BAO / CHEN QIANG | European Patent Office | 2023

    Free access

    Standard layer electromechanical pipeline modular construction method

    AI MINGXI / WANG JIBIAO / LIU JINGANG et al. | European Patent Office | 2024

    Free access

    Pipeline construction device for building electromechanical

    YAN SHOUCHEN | European Patent Office | 2025

    Free access

    Carrying trolley for electromechanical pipeline construction and application method thereof

    LIU FAHUI / HE YURONG / QIU YUENING et al. | European Patent Office | 2025

    Free access