The overwater construction platform capable of adapting to the water level change comprises steel pipe piles and steel plates, the steel pipe piles comprise fixed steel pipe piles and lifting steel pipe piles, the ends of lifting rods of the lifting steel pipe piles are fixedly connected with lifting bearing beams, the fixed steel pipe piles are arranged on the front sides and the rear sides of the lifting steel pipe piles, and pile top bearing beams are fixed to the fixed steel pipe piles; a rack, a lifting bearing beam fixing steel plate, a steel plate fixing surface plate and a water level detection device are fixed to each pile top bearing beam, a motor and a winch are fixed to the steel plate, the motor drives the winch to rotate, a lifting guide device of the steel plate is arranged on the rack, and a second pulley is arranged on the upper portion of the rack. The lifting steel pipe pile is sleeved with an air cushion, if the water level rises, the air cushion is inflated through an air blower, the purpose of adjusting the height of the construction platform according to the change of the water level is achieved, the safety of constructors is maintained, the construction efficiency is guaranteed, and meanwhile energy is saved.

    本发明公开一种可适应水位变化的水上施工平台,包括钢管桩、钢板,钢管桩包括固定钢管桩和升降钢管桩,升降钢管桩的升降杆端部与升降承重梁固定连接,升降钢管桩的前后侧均设置有固定钢管桩,固定钢管桩上均固定桩顶承重梁,每根桩顶承重梁均固定一个机架,升降承重梁固定钢板,钢板固定平面板和水位检测装置,钢板上固定电动机和卷扬机,电动机驱动卷扬机转动,机架上设置有钢板的升降导向装置,机架上部设置有第二滑轮,卷扬机的卷筒绕过第二滑轮后固定钢板,所述的升降钢管桩上套设有气垫,若水位上升,鼓风机给气垫充气,实现根据水位变化调整施工平台高度的目的,不仅维护了施工人员的安全,还让施工效率在得到保障的同时节省能量。


    Access

    Download


    Export, share and cite



    Title :

    Overwater construction platform capable of adapting to water level change and using method


    Additional title:

    一种可适应水位变化的水上施工平台及使用方法


    Contributors:
    LIU LONG (author) / LIU ZONGXIN (author) / ZHANG JIARUI (author) / MOTEYASU (author) / XIE YUXIN (author) / ZHANG HAO (author)

    Publication date :

    2023-01-17


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E01D BRIDGES , Brücken / B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS / E02B HYDRAULIC ENGINEERING , Wasserbau / G01F Messen des Volumens, des Durchflussvolumens, des Massendurchflusses oder des Füllstandes , MEASURING VOLUME, VOLUME FLOW, MASS FLOW, OR LIQUID LEVEL



    Overwater floating pavilion adapting to lake water level change

    MA JIANWU / ZHOU MANNI / WANG YALIN et al. | European Patent Office | 2021

    Free access

    Overwater platform

    ZENG QINGGUO / LI BO / YE MAO et al. | European Patent Office | 2022

    Free access

    Construction platform capable of being used for overwater operation

    YU YINGYING / CHEN WENJIANG / ZHENG SONG et al. | European Patent Office | 2022

    Free access

    Overwater operation platform

    HU YOUZHONG | European Patent Office | 2023

    Free access

    Overwater photovoltaic installation platform

    GUO XIAOHUI / LIU XIN / YAN SHU et al. | European Patent Office | 2023

    Free access