According to the installation method of the ship mooring equipment, the total station is used for accurately measuring three-dimensional coordinates of key point positions of all equipment components in the bow section building stage, and therefore accurate positioning and installation of the mooring equipment are achieved through accurate control. Comprising the construction processes of forward-moving installation section folding, chain unit assembling, anchor windlass assembling, anchor chain and iron anchor integrated installation and the like, so that block hoisting and dock carrying are quicker, the production efficiency is further improved, the dock construction period is shortened, and the production task target is achieved. In the general assembling and carrying stage, the production technology application of hoisting, assembling and welding of the bow block is smoothly completed through the precision control technology, the precision error generated when an anchoring device is installed on a main deck of a main ship body in a manual measurement mode by an operator in the dock stage is effectively avoided, and then large-opening repair operation is avoided. According to the invention, a digital control technical means is applied to a ship construction production system, the field operation efficiency is improved, and the ship construction period is shortened.
本发明提供一种船舶锚系设备的安装方法,在艏部分段建造阶段利用全站仪对各设备部件的关键点位进行三维坐标的精确测量,由此通过精度控制实现锚系设备的精准定位安装,包括完成前移安装分段合拢、摯链器、锚绞机、锚链铁锚一体化安装等建造过程,使得总段吊装及船坞搭载更加快速化,生产效率更进一步提升,缩短船坞建造周期为实现生产任务目标,在总组搭载阶段利用精度控制技术顺利完成艏部总段吊装装焊的生产工艺技术运用,有效避免了船坞阶段由作业人员在主船体主甲板上手工测量的方式安装锚系设备所产生的精度误差,进而避免了大开刀返修作业。本发明以数字化控制技术手段运用到船舶建造生产体系中,提高了现场作业效率,缩短船舶建造周期。
Installation method of ship anchoring and mooring equipment
一种船舶锚系设备的安装方法
2022-11-22
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
European Patent Office | 2024
|