The invention discloses a method for quickly replacing a steel wire rope of a dry quenching elevator, which can shorten the maintenance time, reduce the influence degree on dry quenching production and yield and improve the safety of equipment by installing auxiliary facilities, fully preparing and replacing new and old steel wire ropes.
本发明公开了一种快速更换干熄焦提升机钢丝绳的方法,通过安装辅助设施,充分准备,更换新旧钢丝绳方法,能够缩短检修时间,降低对干熄焦生产和产量的影响程度,提高设备的安全性。
Method for quickly replacing steel wire rope of dry quenching elevator
一种快速更换干熄焦提升机钢丝绳的方法
2022-08-19
Patent
Electronic Resource
Chinese
IPC: | B66D Haspeln , CAPSTANS |
Device and method for quickly replacing crane steel wire rope
European Patent Office | 2021
|Method for replacing steel wire rope of multi-rope friction type elevator
European Patent Office | 2022
|