The invention provides a tunnel output muck transfer station located on a steep slope and a transfer method. Multiple stages of channels which are sequentially reduced from top to bottom are erected on a slope body, a stage-by-stage lifting manner of a lifting platform is used for transferring tunnel construction muck on the steep slope to the under mountain, an existing road on the under mountainis used for transferring the muck to a spoil area, compared with muck conveying during panshan mountain shortcut building, construction input can be greatly saved, the damage degree of the mountain is small, and the construction safety and the construction efficiency can be improved.
本发明提供一种位于陡峭坡体上的隧道出渣转运站及转运方法,在坡体上搭设有自上而下依次降低的多级通道,利用升降平台逐级升降的方式将陡峭坡体上的隧道施工渣土转运到山下,然后利用山下既有道路运至弃渣场,相比修筑盘山便道运渣,可大幅节约施工投入,对山体的破坏程度也较小,并且能提高施工安全性及施工效率。
Tunnel output muck transfer station located on steep slope and transfer method
一种位于陡峭坡体上的隧道出渣转运站及转运方法
2020-06-12
Patent
Electronic Resource
Chinese
Shield tunnel construction period muck transfer facility and using method thereof
European Patent Office | 2025
|Automatic coupler for tunnel muck cars
Engineering Index Backfile | 1948